Racing the rain to build this pond!
![](https://www.symbiosistx.com/wp-content/uploads/2023/06/Earthworks-Seeding-Website-Potential-Photos-10-May-16-2019-02_41pm-cVL9-1024x768.jpg)
Time lapse video of our team racing the rain to build a 1/2 acre pond designed and built in collaboration with Pete VanDyck of Drought Proof Texas from 2018 in Brenham, Texas. We used a bulldozer and vibratory, sheep’s foot roller to build this pond in about 1.5 weeks. We were racing the rain to […]